Factory Building - MM Nagar
MM Nagar, Chennai2020
MM Nagar factory expansion providing scalable manufacturing floors with robust utilities backbone and lean material flow.
78,000 sq.ftBuilt-up area
6 baysLoading docks
10 monthsExecution time
S-01
Scope of Work
- Composite steel columns with RCC plinth beams
- Dock levellers, rolling shutters, and insulated roofing
- Central utility block for DG, chillers, and compressors
- Peripheral road, drains, and security infrastructure
O-01
Outcomes & Impact
- Improved material handling time by 28% via linear dock planning
- Reduced roof heat gain with double-skin panels and turbo vents
- Provisioned spare capacity for 30% future machine additions